You will be doing the following roles:
- Review plans/specifications/shop drawings/BIM Model in coordination with TSD OpCen prior to procurement and during implementation, including generation of RFI's.
Perform Material Take-off (QS) of each MEPFS trade (Bid vs IFC) as reference during implementation, cost reconciliation (billings/change orders), productivity analysis.- Coordinates/directs MEPFS subcontractors/suppliers for the preparation of product data/shop drawings.
Coordinates/directs MEPFS subcontractors/suppliers for the implementation of works at site based on PEP/PES.
- Performs Productivity Analysis of each item of work covered by every MEPFS subcontractor during implementation. Results shall be recorded in data bank of each project as referenced during billing/CO , cost reconciliation and for future projects.
Implements all works based on Safety, Quality, Time and Cost program of MDC.- Attends to scheduled cost reconciliation between MDC cost engineers/QS and subcontractor/suppliers regarding billings and change orders.
Implements the Testing and Commissioning Plan/Program for each MEPFS trade.
Job Type: Fixed term
Contract length: 6 months
Pay: Up to Php30,
- 00 per month
Schedule: - 8 hour shift
Ability to commute/relocate:
- Santa Rosa City, Laguna: Reliably commute or planning to relocate before starting work (Preferred)
Education:
Experience:
- Electrical Engineering: 4 years (Required)
License/Certification:
* Registered Electrical Engineer (Preferred)